How A Welding Machine Travels: Our Export Packing Method
2026/10/28
How a Welding Machine Travels: Our Export Packing Method
Machines are rarely damaged at sea. They are damaged in the forklift, in the transfer yard, and in the last kilometre before the customer, where a crate is dropped, tipped or stacked by someone who has never seen what is inside. Packing is therefore not wrapping; it is engineering for the worst handling the route is likely to include.

A crate closed and loaded inside the container. The brand mark, the up arrows and the label on the face are part of the packing, not of the paperwork.
This is the method we use, in the order it happens, with the reasons for each layer. Buyers do not usually watch this part of the process, which is exactly why it is worth writing down.
Bolted Down, Not Just Wrapped
The machine is fixed to a skid first, through its own feet, so that machine and skid move as one object. Bracing goes in wherever the centre of gravity is high or the footprint is narrow, and the lifting points are marked and photographed. A machine that can shift inside its own packaging will find the weakest wall of the crate, and the crate always loses.
This is also the stage where the movable parts are secured: the arm is blocked, hoses are routed away from pinch lines, and anything that swings is tied. A machine that arrives with a bent electrode arm was usually fine when it left; the arm was free, and the road did the rest.
The skid also decides how the crate can be picked. Fork slots on both sides are only useful if the centre of gravity sits between them, which is why the heavy components, the transformer and the water system, are placed low and central. A crate that can only be lifted from one end is a crate that will be dropped at one end.
Film, Foam and the Order of the Layers
The wrapping sequence is film against the machine to keep dust and moisture off, foam at the corners and contact points, then a second outer layer of film to hold the foam in place. Electronics and the control panel get their own bag and desiccant, because a container crossing the equator produces more condensation inside the crate than most buyers expect, and the panel is the part that cannot be wiped clean afterwards.
The layers do different jobs and the order matters. Foam against film slides; film against paint can mark it; and a single layer of either does neither job properly.
For long transits, and especially to humid destinations, we add corrosion protection at the exposed metal: a vapour-phase inhibitor sheet over the machine and desiccant bags taped inside the electronics bag. Rust on a machine that has spent six weeks at sea is not a quality problem in the engineering sense, but it is the first thing a buyer sees, and first impressions are not re-argued with chemistry.
The Crate Itself
Our export crates are plywood on a timber base, with fork slots on both sides so that a forklift can approach from either direction at the destination. The timber is treated and stamped to the ISPM 15 standard, which is what customs officials look for on a wooden crate crossing a border. The crate carries the machine number, the gross weight and the this-way-up marks, and the weight on the crate matches the weight on the shipping documents, because a mismatch is one of the quiet ways a shipment gets held.
Crate dimensions are decided with the container in mind. A crate that is fifty millimetres too wide turns a standard shipment into a special one, so the outer dimensions are checked against the internal width of the container before the crate is built, not after. The same check covers height, because a tall crate that has to be tilted to enter a container has already failed its first test.
Marking belongs to the packing rather than to the paperwork. The machine number stencilled on the outside is what links the physical box to the shipping documents and to the order file, and it is the first thing anyone looks for when a crate is one of nine in a container. Consignee details are printed rather than written by hand for the same dull reason: handwriting is the part of a shipment that gets misread.
What Goes Inside Besides the Machine
Above the foam, in the space the lid will close over, travels the accessories kit: the tools, the spare electrodes, the cables coiled and bagged, and the document pouch with the packing list and the run-off record. Everything in the kit appears on the packing list, and the packing list is also photographed into the order file, so that a missing item is a claim rather than an argument.
The reason the kit rides inside the crate rather than in a separate box is simple: separate boxes get separated. The one thing a machine cannot be commissioned without is the thing most likely to be on another pallet.
The kit is sized from the consumables list agreed in the quotation rather than from habit. A machine that dresses its caps every few thousand welds on a production line goes through them faster than one in a maintenance shop, and the difference between a shift of spares and a month of spares is a better conversation now than in week three.
Loading, and the First Hour at the Destination
In the container the crate is strapped and braced so it cannot walk, and the loading is photographed, because the last photo of a shipment in good order is the first exhibit if there is a claim. At the other end, the checks worth doing before the driver leaves are quick: photos of the crate from four sides, a look for punctures or tilt, and a note of anything unusual on the delivery note. After signing, the crate is worth keeping until the machine is installed, because the skid is the rigging base and the panels are the protection while the machine is moved into position.
Buyers who do these four things resolve nearly every transport damage question in their own favour, because the evidence exists before anyone starts assigning blame.
The table is the version we send with the shipping documents, in the order the steps happen, because the sequence matters as much as the actions.
|
When |
What to do |
Why it matters |
|
Before signing |
Photograph the crate from four sides |
Records the condition at arrival, not an hour later |
|
Before signing |
Look for punctures, crush marks and tilt indicators |
Localises the damage to one face of the crate |
|
Before signing |
Write any exception on the delivery note |
A clean signature is treated as a clean receipt |
|
After unloading |
Keep the skid and the crate panels |
The skid is the rigging base during installation |
|
Before power-up |
Compare the nameplate with the site supply |
Catches the one error no transport claim can cover |
PDKJ continues to provide customized laser welding and resistance welding solutions based on different materials, workpiece structures, welding requirements, and production applications.
Related Products

Our assembly area in Dongguan, where machines are prepared, packed and loaded in the same building.
Contact PDKJ
Send us your part drawing or a sample, and our engineers will run a welding feasibility trial on your own material and recommend the equipment configured for your application.
WhatsApp: +86 136 1279 3248
Email: jay@gd-pw.com
Website: https://www.spotlaserwelding.com/contactus.html
Address: 1-2F, Building 3, Qichen Industrial Park, No. 26 Luxi 1st Road, Liaobu Town, Dongguan City, Guangdong Province, China