logo

Door Hinge Projection Welding Machine

Basic Information
Place of Origin : CHINA
Brand Name : PDKJ
Certification : CE ISO SGS
Model Number : Custom
Trade Information
Minimum Order Quantity : 1 unit
Price : 10000-30000 USD
Standard Packaging : Wooden Case
Delivery Time : 14 work days
Supply Ability : 100 set per month
Product Attributes
Highlight

Door Hinge Projection Welding Machine

,

Customized Welding Machine for Door Hinges

,

Projection Welding Machine Customized Solution

Product Summary

Door Hinge Projection Welding Machine is designed for efficient and precise hinge welding on metal doors. It provides stable pressure control, strong weld joints, and consistent quality for door manufacturing and sheet metal applications.

Product Description
Contents

The Hinge Is Welded Blind: One Face Takes The Force, The Other Face Has To Come Out Clean

Application story  ·  Projection welding of hinge reinforcement brackets to appliance and cabinet door panels - two heads per stroke, one-sided welding against a copper backing, no witness mark on the face that gets painted

A door panel is finished before it is welded. The sheet is rolled, the edges are folded, the handle opening is cut, and the whole outside face has already been cleaned or coated by the time the hinge reinforcement arrives. Then three stamped projections on the back of that bracket have to fuse into a sheet seven tenths of a millimetre thick, carrying the full weight of the door on a hinge that will be opened ten thousand times.

Door Hinge Projection Welding Machine 

Door panel hinge projection welding machine: two C-frame heads on one bed with a ball transfer table between them, transformer and control in each head, chiller at the base

The Part: A Finished Face, And A Bracket That Has To Be Welded To The Other Side

The workpiece is a flat door panel - cold-rolled or galvanised sheet around 0.7 mm, edges folded into a return flange, a rectangular cut-out where the handle or the glass goes, and mounting tabs folded along the perimeter. They arrive stacked twenty to a pallet, and every one of them is already a visible part. There is no second operation after welding that will hide a mark, because the next station is paint.

The bracket is a U-channel reinforcement, two to four millimetres thick, with two or three projections stamped on its back face. Those projections are the entire weld: they are the only places where the current is allowed to concentrate, and they have to collapse at the same moment, into their own seats, under enough force that the sheet underneath does not lift away from the backing before the nugget forms.

Door Hinge Projection Welding Machine 

The panels as they arrive at the welder: folded edges, handle cut-out, finished outer face - the side that must not be marked is the side that is already done

Two Hinges, One Stroke

Two C-frame welding heads stand on one bed, spaced to the hinge pitch of the panel, each with its own press cylinder, its own transformer and its own welding schedule. The hinge pair is welded in a single stroke, which is not only about cycle time. Weld one hinge, release, index, weld the second, and the panel relaxes between the two - the first nugget shrinks as it cools, the sheet springs, and the second weld is then made on a part that has already moved. Two heads pressing at the same time hold the panel flat between them while both nuggets form.

The throat is 500 x 350 mm, so a head can reach a hinge that sits well inboard of the panel edge instead of requiring the operator to hang the panel off the side of the machine. Electrode force goes to 12 000 N, and the electrode travels 100 mm, which is the room needed to clear a folded flange on the way in.

Door Hinge Projection Welding Machine 

The two heads facing each other across the table: press cylinder and handwheel on top, brass electrode arms below, ball transfer table running between them

The Current Has To Come Back Somewhere

This is a closed panel. There is no lower arm that can reach behind a hinge reinforcement that sits inside a folded door, so the weld is made from one side only. The upper electrode - a wide copper block, 20 x 60 mm on a 31.6 mm holder - comes down on the bracket; the current crosses the projections, spreads through the panel thickness, and returns into a copper backing pad that the panel is resting on.

That backing pad is what protects the visible face. It presents a contact area many times larger than the nugget, so the current density on the outer surface is low and spread out, and the face that gets painted comes off the machine with no electrode ring, no dent and no heat tint. Nothing has to be dressed, sanded or re-coated afterwards - the panel goes from the welder to the paint line.

Door Hinge Projection Welding Machine 

One-sided welding in close-up: copper electrode block above, locating pins standing on the panel, pneumatic fork clamp holding the edge, copper backing under the sheet

Indexed By The Machine, Not By Eye

A panel this size is light and floppy at the same time. Lifted by hand from a stack it oil-cans; laid down and pushed to the second hinge position by hand, it lands within a few millimetres of where it should be - and a few millimetres at the hinge is a door that hangs crooked on the cabinet.

So the panel is never lifted between welds. The table is covered with ball transfer units: the sheet floats on them and slides in any direction under a light push, without being raised off the tooling. Positioning comes from the tooling, not the operator - copper locating pins set the bracket, pneumatic fork clamps hold the panel edge, and a servo carriage running the length of the table on a linear rail indexes the panel from one hinge position to the next. Loading is done with a vacuum lifter whose cups hold the sheet flat, so it goes onto the table already true.

Door Hinge Projection Welding Machine 

The table runs the full length of the panel: ball transfer units under the sheet, hardened guide rails along it, and the drag chain of the servo carriage that indexes the next position

Door Hinge Projection Welding Machine 

Door Hinge Projection Welding Machine 

Loading with a vacuum lifter - the cups keep the sheet flat

In position: panel clamped, electrode above the bracket

Door Hinge Projection Welding Machine 

The edge in detail: fork clamp holding the folded hem, bearing rail under the sheet, copper electrode coming down on the bracket position, ball transfer table behind

What Comes Off The Machine

Two projection welds per bracket, flush with the bracket face, no spatter on the panel, no burn-through, and a shallow even indent where each projection collapsed. The heat tint ring sits under the bracket, where the paint covers it. On the outside face there is nothing to see, which is the point: the weld is judged by what the visible side looks like, and the visible side is untouched.

The mark on the bracket side is not a defect to be polished out - it is the evidence that the projection collapsed into its seat instead of sitting on top of it. A weld that leaves no indent at all is a weld that did not fuse.

Door Hinge Projection Welding Machine 

Off the machine: bracket welded to the panel near the folded edge, two clean nuggets, no spatter, no distortion of the surrounding sheet

How The Machine Is Put Together

Both heads carry their own transformer and control cabinet in the frame, with air preparation and a numbered solenoid manifold on the side of each - so a fault on one head does not take the other out of the cycle, and the two schedules can differ when the two hinges are not the same part. Water cooling runs to each electrode and transformer at 20 L/min, with the chiller standing beside the base rather than inside it, where it can be serviced without dismantling the machine.

The table and its frame are welded and machined as one assembly, standing on levelling feet, so the tooling plane does not move when the machine is relocated. Controls are on a swing arm at the operator's side: the panel is large, the operator stands at the end of the table, and the screen has to come to them.

Door Hinge Projection Welding Machine 

Operator side: chiller, transformer cabinet, air preparation and the cable run along the frame

Door Hinge Projection Welding Machine 

Door Hinge Projection Welding Machine 

Head, transformer cabinet and air manifold

Both stations from the loading end

 

Door Hinge Projection Welding Machine 

Door Hinge Projection Welding Machine 

Door Hinge Projection Welding Machine 

Base, chiller and water circuit

Left head from the operator side

Blue frame, transformer and manifolds

Door Hinge Projection Welding Machine 

Rear of the machine: main cylinders and air/oil accumulators above, water manifolds and solenoid banks below

Key Specifications

Item

Specification

Product name

Door panel hinge projection welding machine (门板铰链凸焊专机)

Rated capacity

450 kVA

Input power

3-phase 380 V

Maximum short-circuit current

100 kA

Duty cycle

20 %

Control mode

Primary / secondary constant current

Inverter frequency

1000 Hz

Arm extension (throat)

500 x 350 mm

Maximum electrode force

12 000 N

Electrode stroke

100 mm

Cooling water flow

20 L/min

Welding capacity - aluminium

5.0 + 5.0 mm

Welding capacity - carbon steel

6.0 + 6.0 mm

Electrode arm size

⌀74 x 195 mm

Electrode holder size

⌀31.6 x 250 mm

Electrode tip size

⌀20 x 60 mm


Works specification plate - the ratings in the table above are taken from it

Where It Welds

•   Hinge reinforcement brackets welded to appliance door panels - refrigerators, washers, dryers

•   Cabinet and enclosure doors where the hinge plate is welded from the inside only

•   Panels that arrive already coated or primed, where a weld mark means a rework or a scrap

•   Hinge, latch and stiffener brackets located by pins rather than by the operator's eye

•   Multi-position welding on one panel where a single load has to cover every bracket

•   Thick-sheet projection welds on thin visible sheet - aluminium 5 + 5 mm, carbon steel 6 + 6 mm

Tooling, schedules and the number of heads are built from the panel drawing. We weld sample panels from your production stack and check both faces before the final schedule is set - the outside face for marks, the bracket side for collapse.

From Drawing To Production

01   Panel drawing, hinge position and bracket projection review

02   Sample welding on your panels, with both faces inspected and nugget sectioned

03   Process proposal - head count, throat, force, power source and cycle estimate

04   3D design of the machine, the ball transfer table and the indexing carriage

05   Frame, cylinders, electrode assemblies, water circuit and chiller build

06   Inverter power source and control integration, schedules programmed

07   Assembly and run-off on customer panels in our workshop

08   On-site installation, commissioning and first-article approval

09   Operator training, then after-sales support and spares

Talk to Pudian Technology

Guangdong Pudian Automation Technology Co., Ltd builds resistance and laser welding equipment in-house - transformers, controllers, electrodes, fixtures and complete machines - one team, one solution. Need to weld a bracket onto a panel that is already finished on the other side? Send us the panel drawing and a sample, and we will build the schedule around the face you cannot mark.

Guangdong Pudian Automation Technology Co., Ltd

WhatsApp / Tel: +13613793248    Email: jay@gd-pw.com

Website: https://www.spotlaserwelding.com/

Address: 1-2F, Building 3, Qichen Industrial Park, No. 26 Luxi 1st Road, Liaobu Town, Dongguan City, Guangdong Province, China

All figures above are the rated values of this model; final configuration, tooling design, head spacing and cycle time are set by the agreed process solution and the panel drawing.

Send Us An Inquiry
We will reply to you within 24 hours.
Inquiry Details
Contact Information