Delivery And Installation Milestones
2026/10/16
Delivery and Installation Milestones
A welding machine is only a product until it is installed; it becomes an asset on the day it produces its first qualified weld in the customer’s workshop. This update summarises the delivery and installation milestones recently completed across the PDKJ laser and spot welding lines, and - usefully for anyone planning a purchase - the standard process those projects followed, from packing to first article approval.
Recent Milestones
Over the past weeks, systems have left the factory for customers across several industries - a sheet metal fabricator taking a platform laser welding machine for enclosure work, a hardware manufacturer adding a spot welding line for wire products, and automated workstation projects for customers who needed welding integrated into an existing flow. Details remain with the customers, but the pattern is consistent: standard models are shipping on the confirmed lead times, and customised systems are moving through their acceptance runs before dispatch.
The Standard Installation and Commissioning Flow
Every installation follows the same sequence, refined across many sites: site preparation confirmed against a checklist before shipment; machine positioned, levelled and anchored; power, gas and cooling connected and verified; safety functions tested; then parameter loading and weld trials on the customer’s own material. The visit ends with a first article approval - the customer judges the welds, not the brochure - and the machine is only handed over when that standard is met.
Training: What the Operator Learns
Installation includes operator training as standard: safe operation, fixture handling, parameter selection within the qualified window, daily checks for optics, electrodes and cooling, and the first-line response to alarms. The goal is simple - after the training, the customer’s team runs the machine without us in the room, and knows which questions to ask when something changes.
For Overseas Installations: What to Prepare
- Power supply details confirmed against the machine specification (voltage, phases, earthing).
- Floor loading and space, including access routes for the crate.
- Compressed air quality where the process needs it, and water quality where a chiller is used.
- A named operator (or two) available for the full training period.
- Sample parts and drawings ready for the weld trials on day one.
Where travel is not practical, remote commissioning covers the same sequence over video, and many customers now mix both: remote set-up followed by a later service visit.
Spares and After-Sales Response
Every machine ships with a starter spares kit matched to its process and usage profile, and replenishment parts are dispatched against the machine serial number so the correct version arrives the first time. Support runs through the factory email and WhatsApp channels - pdkj@gd-pw.com - with the standard fault reporting checklist (nameplate data, fault code, material, parameters, photos) helping to speed up every support case from the first message.
Conclusion
Delivery and installation milestones are the quiet proof of how a manufacturer works. If you are planning a machine purchase and want the installation picture in detail - lead times, site checklist, training scope, spares policy - ask for it before you order, not after. A manufacturer that runs tight installations will have those answers written down already, and showing you the document costs them nothing at all.
Related Products
Contact PDKJ
Send us your part drawing or a sample, and our engineers will run a welding feasibility trial on your own material and recommend the equipment configured for your application.