The Crate Contains More Than a Machine

A crate leaves our floor looking like a box with a machine inside. What is actually in it is the machine plus everything that decides whether the first week at the customer's site goes smoothly — and that list is longer than most buyers expect, largely because two of its items are numbers the buyer usually sends after the crate has been nailed shut.

This is what we pack, which two numbers we need before packing, and the mistakes we have made by assuming them.

latest company news about The Crate Contains More Than a Machine  0
A robot cell in its crate, loaded into the container. The wooden box is the last thing we control and the first thing the customer opens. What Is in There Besides the Machine

For a robot cell, the machine is the smaller half. The teach pendant and its cable, the robot harness coiled and taped at the connector, the torch or gun with its water and gas hoses cut to length, a spares kit of tips, nozzles, electrodes and a spare liner, the transformer tap table, levelling shims, and the manual in the language of the destination.

The crate lid is also where the loose items are photographed before closing, one shot per layer. When something turns up missing, that set of photographs tells us which layer it should have been in, which turns an argument into a five-minute check.

The packing list belongs to that kit as much as the spares do, and it has to agree with the commercial invoice line for line. A crate whose list says "accessories, one set" while the invoice lists three separate items is a crate that will be opened at the port, and a missing item inside it will be settled by whoever can produce a document rather than whoever remembers the loading.

The Voltage Question

Two numbers decide more of the packing than any other: the site voltage and the frequency. 380, 400, 415 and 440 V are all in daily use, 50 Hz and 60 Hz are both in daily use, and a welding transformer is tapped for one of them. On the wrong tap the machine does not fail outright — it behaves oddly. Secondary current comes up short, the operator raises the setting to compensate, and the weld goes from under-cooked to expelling without ever passing through correct.

Control coils are the quieter version of the same problem. A contactor wound for one voltage will chatter on another for a few weeks before it welds itself shut, and by then the commissioning report says everything was fine.

latest company news about The Crate Contains More Than a Machine  1
The loose items laid out on the crate lid before closing: teach pendant, coiled harness, hoses with their ends taped. Each layer is photographed, so a missing item can be traced to a layer. Cable Length Is a Layout Decision

The cable between the cabinet and the fixture is cut to the layout, and the layout is a drawing the customer has and we usually do not. Where the cabinet sits relative to the fixture decides hose and harness length, and on a long run the conductor cross-section has to change, because voltage drop on a welding secondary is not a small effect.

The robot harness is the part that cannot be corrected later. It arrives at a manufacturer's length, and it cannot be spliced in a way that keeps its rating.

What We Have Got Wrong

We have cut hoses to our own bench layout and shipped them. The customer's fixture sat a metre further from the cabinet than ours did; the hoses reached, then pulled at the strain relief on every cycle. Their maintenance team spliced in a length of local hose with a barb fitting — exactly the repair that becomes a pressure fault six months later and gets blamed on the machine.

Since then, a layout drawing with the cabinet position marked is a required attachment before a crate is closed. If it is missing we ask for it, rather than assume a metre.

Before the Crate Is Nailed Shut
  • Site voltage and frequency, in writing on the order, not in a conversation.
  • A dimensioned layout showing where the cabinet and the fixture will stand.
  • The name of the person at your end who will commission the cell, and whether they read English.
  • Which spares you want in the first crate, because the second one travels by air at your cost.

None of that is engineering that happens after delivery. It is decided while somebody stands in front of an open crate with a nail gun, which is the worst possible moment to be guessing.

PDKJ continues to provide customized laser welding and resistance welding solutions based on different materials, workpiece structures, welding requirements, and production applications.

Related Products
latest company news about The Crate Contains More Than a Machine  2
Part of our robot line in Dongguan, where the cell is assembled and run before it is taken apart for packing. Contact PDKJ

Send us your part drawing or a sample, and our engineers will run a welding feasibility trial on your own material and recommend the equipment configured for your application.

WhatsApp: +86 136 1279 3248

Email: jay@gd-pw.com

Website: https://www.spotlaserwelding.com/contactus.html

Address: 1-2F, Building 3, Qichen Industrial Park, No. 26 Luxi 1st Road, Liaobu Town, Dongguan City, Guangdong Province, China