logo

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes

Basic Information
Place of Origin : Guangdong , China
Brand Name : PDKJ
Certification : CE ISO SGS
Model Number : Custom
Trade Information
Minimum Order Quantity : 1 unit
Price : 10000-30000 USD
Standard Packaging : Plywood Case
Delivery Time : 15-30 work days
Supply Ability : 100 set per month
Product Summary

Radiator tube cutting and welding cell: die shear and 6-axis AC/DC TIG in one enclosure, cut and weld on one datum, POM profile jaws, 350 A pulsed TIG, 1 mm aluminium gas-tight past 100 kg.

Product Description
Contents

A 1 mm Wall, A Cut End, A 100 kg Pressure Test: The Leak Is Decided Before The Torch Is Lit

Application story  ·  Automatic cutting and welding cell for aluminium radiator tubes - die shear and 6-axis TIG under one enclosure, cut and weld on one datum, gas-tight past 100 kg

A radiator tube is cut to length, its end is closed with a weld, and the finished radiator goes to a pressure test. The acceptance line on this part is short: gas-tight, no rupture above 100 kg. Everything the tube needs is decided in the space between the shear and the torch - whether the cut end is square enough for two edges to meet, clean enough for the arc to fuse them, and whether the part is still held where it was cut. This cell does both, so none of it has to be found twice.

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Radiator tube cutting and welding cell: full sheet-metal cabinet, two filtered weld windows, shear station and welding station on one base, teach pendant and monitor at the operator side

The Part: One Millimetre Of Aluminium, And A Tube That Has To Hold Gas

The workpiece is a flat aluminium tube for a radiator - 1 mm wall, cut to length, end closed by a weld. After welding the radiator is pressure tested, and on this part the line is gas-tight with no rupture above 100 kg. Nothing about the joint is generous: the wall is thinner than the weld pool is wide, so the heat has to reach the seam and stop there, and the two edges have to be in contact before the arc arrives.

That last point is where most of the trouble in this kind of welding starts. A cut end is one of the two edges the arc has to fuse. Square, burr-free and undistorted, the edges sit together and melt into one section. Tapered, torn or rolled over by a saw blade, the arc has to bridge a gap instead of joining two faces - penetration drops, oxide is trapped in the gap, and the joint holds pressure long enough to look right and not long enough to pass.

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Cut station loaded: tube in the profile jaws, shear head above, feed rail and cable chain below

The jaws are machined POM, cut to the tube section - they hold the flats, not a point

Cut And Weld On One Datum, Under One Roof

The shear and the torch stand on the same fabricated base, inside the same enclosure, and they hold the part against the same reference. The tube is cut, and the piece that leaves the shear is the piece that is welded - it is not taken out of the cell, stacked, carried to a second machine and clamped again.

That is the difference between one set-up and two. On two machines the second clamp has to find the end the first one made, and it never finds it exactly: aluminium springs when the clamp is released, a burr sits between jaw and part, and the weld programme is written for a position that has already moved by a few tenths. Here the datum does not change between the cut and the arc, so the schedule is proved once and repeats.

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Cutaway of the cell: shear on the left gantry, welding station to the right, one base plate and one enclosure - the workpiece is clamped once

Two Stations, One Frame

The cell is laid out on one axis. At the left, a shear head runs on a gantry over a pair of linear guides: the tube is fed to a stop, clamped, and cut by a die. A die cut, not a saw cut - no chip, no coolant, no burr rolled over the edge, and no heat put into the cut zone a moment before it becomes a weld preparation.

The cut piece is then held in its profile jaws and presented to the welding station, where the 6-axis arm brings the torch in. Run the section drawing against the plan view and the argument is visible: stop, jaws, blade and weld position all hang off the same base plate, which is why the cut and the arc agree with each other.

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Front section: cut station at the left, welding station at the right, torch on the gantry beam

Plan view: feed axis, both clamp stations, shear die and transfer between them

The Shear: A Die Cut Is The First Half Of The Weld

A saw cuts aluminium with a blade one or two millimetres wide and leaves a burr on the side it exits. On a 1 mm wall that burr is a ridge the jaw cannot close on: the part sits proud by the height of the burr, and the seam that follows has a gap in it at exactly the place where the tube is thinnest.

A die shear pushes a hardened blade through the wall against a fixed die. The cut face is square to the axis, the burr goes to the scrap side, and the piece that stays in the jaws is the clean one. That is the reason the shear belongs in this machine rather than upstream on a saw: the cut surface is a weld preparation, and it is made 300 mm from the torch that has to use it.

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Through the weld window: the shear head coming down between its guide bars

Weld position: torch on the seam, jaws either side, shear station behind

The Torch: AC TIG, Pulsed, Because The Wall Is One Millimetre

The power source is a digital IGBT unit: 3-phase 380 V at 50/60 Hz, 16.6 / 13.5 kVA input, 62 V DC no-load, 35 % duty cycle. On aluminium it runs AC TIG from 10 to 350 A, on steel DC TIG from 4 to 350 A, with pulse available across the same range; the stick mode up to 300 A is there for the fixture and frame work around the cell.

AC is what makes aluminium weldable at all: the positive half-cycle breaks the oxide that re-forms within seconds of cleaning, the negative half-cycle does the melting and keeps the tungsten alive. Pulse then gives a 1 mm wall its heat in short doses - peak current to fuse, background current to let the pool freeze - so the seam is a run of overlapping spots instead of one long puddle that ends in a hole.

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Inside the cell: the TIG power source, and the arm at the weld station

Operator side: light curtain across the load opening, control box on the front rail

The Jaws Are POM, Not Steel

The jaws that hold the tube are machined from POM to the profile of the part, so they touch the tube along its flats instead of at one point. A steel jaw tightened enough to hold a part for welding also marks it, and on a visible radiator face a mark is a reject before the weld has even been checked.

POM also stays out of the electrical and thermal path. It does not shunt current between part and fixture, it does not pull the arc's heat into a metal block a millimetre from the seam, and it does not gall the aluminium as it closes. Jaws are per-part and replaceable: a new radiator profile is a new set of inserts, not a new machine.

A Cabinet, Not A Frame

The cell is a sheet-metal cabinet, not an open frame with a fence around it. Two windows with filtered weld glass let the operator watch the seam without lifting a shield, the load opening is closed by a light curtain, and arc, spatter and fume stay inside - which matters when the cell is installed next to the rest of a radiator line rather than in a corner of its own.

The rest of the cabinet is what makes it a machine rather than a prototype: casters to move it and levelling feet to fix it, a stack light on the roof, the teach pendant and monitor on an arm at the operator side, and cable and pneumatic runs kept inside closed ducts. Every panel opens; nothing is welded shut.

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Front face: two filtered weld windows, pendant and monitor on the right-hand arm

From the operator corner: pendant on its lead, keyboard tray, part chute in the base

 

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Left-hand end and rear: louvred panel, pneumatic manifold inside the base, stack light on the roof, casters and levelling feet

Running In A Plant, Not In A Demo Room

The photographs of the cell on a production floor are the same machine: installed with a walkway line beside it, a neighbouring machine working one bay over, and an operator in a coat at the next station. It is levelled on its feet, connected to 3-phase power, air and extraction, taught the part, and left to run.

That is the practical argument for a closed cabinet in a line. The cell takes its floor space, its power and its air; the people working around it are not watching an arc, and the fume does not go into the bay next door.

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Front and left-hand end: two windows, keyboard tray, pendant holstered on the side

Installed beside a working line: pendant and monitor on the arm, work continuing in the next bay

What Ships Is A Machine

The unit is lifted on its base frame with straps, wrapped in stretch film and loaded complete - not crated as a pile of parts to be rebuilt on site. The lift points are the base, which is where the mass is; nothing hangs off the panels.

Delivery includes installation and commissioning, a part programme taught on the customer's own tubes, and a run-off on those tubes before shipment - the samples welded there are the ones that get pressure tested.

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Automatic Cutting And Welding Cell For 1 mm Aluminium Radiator Tubes 

Lifting on the base frame, wrapped and strapped

Wrapped complete before loading - no dismantling

Key Specifications  -  Welding Power Source

Parameters

TIG 350 digital IGBT power source

Control method

Digital IGBT

Rated input supply / phase

3-phase, AC 380 V

Input frequency

50 / 60 Hz

Rated input capacity

16.6 / 13.5 kVA

Rated no-load output voltage

DC 62 V

Rated output current

TIG 350 A / MMA 300 A

Rated output voltage

TIG 24 V / MMA 32 V

Rated duty cycle

35 %

Output current range

DC TIG 4 - 350 A / AC TIG 10 - 350 A / MMA 10 - 300 A

Output voltage range

TIG 10.2 - 24 V / MMA 20.2 - 32 V

Pulse current

DC TIG 4 - 350 A / AC TIG 10 - 350 A

 

Part and process

As quoted for this sample

Sample part

Radiator tube

Material

Aluminium

Wall thickness

1 mm

Acceptance requirement

Gas-tight; no rupture above 100 kg

Cut

Die shear inside the cell

Weld

6-axis TIG, AC / DC with pulse

Part holding

Machined POM profile jaws, one set per tube section

Loading

Light curtain across the load opening

Enclosure

Sheet-metal cabinet, two filtered weld windows

Installation

Casters and levelling feet; 3-phase 380 V, air, extraction

Cut finish, jaw design and welding schedule are set from the tube drawing and the sample: the electrical settings above are the power source's published range, not a recipe for a given tube.

Where It Fits

•   Aluminium radiator tubes, 1 mm wall, cut to length and closed by a weld in the same cell

•   Flat and oval tube sections where the cut face is the weld preparation

•   Parts that are pressure tested after welding - gas-tight is the acceptance line, not appearance

•   Radiator, charge-air cooler and battery cooling plate tubes in the same family of parts

•   Small and medium batches: a new tube profile is a new set of POM inserts, not a new machine

•   Any joint where the leak trace ends at a saw burr or at a second clamp

Tube section, cell length and jaw design are quoted per job; the enclosure and the operator side are laid out to the footprint the customer has.

From Sample To Machine

01   Tube drawing, section, wall thickness and joint position review

02   Cut samples - face squareness, burr side and cut finish agreed

03   Weld samples - seam, penetration, then pressure test to the customer's line

04   Jaw design: POM inserts to the tube section, load and unload positions

05   Cell layout: shear, transfer, weld station and enclosure to the plant footprint

06   Build: base, gantry, linear guides, shear die, robot and TIG power source

07   Run-off on customer tubes, including the pressure test

08   Crating, shipment, installation and commissioning

09   Operator training, programme handover and after-sales support

Talk to Pudian Technology

Guangdong Pudian Automation Technology Co., Ltd builds welding equipment in-house - power sources, controllers, fixtures and complete machines - one team, one solution. Cutting a tube and welding its end in one set-up? Send us the tube drawing, the section and the pressure-test requirement, and we will cut and weld a sample and send back both the seam and the test result.

Guangdong Pudian Automation Technology Co., Ltd

WhatsApp / Tel: +13613793248    Email: jay@gd-pw.com

Website: https://www.spotlaserwelding.com/

Address: 1-2F, Building 3, Qichen Industrial Park, No. 26 Luxi 1st Road, Liaobu Town, Dongguan City, Guangdong Province, China


Send Us An Inquiry
We will reply to you within 24 hours.
Inquiry Details
Contact Information